Project Overview
As the Main Contractor, MetaSol spearheaded the design, supply, and installation of a 39.24kWp Three-phase Hybrid Solar System with Lithium Storage in collaboration with URDA (Union of Relief and Development Associations). Executed with precision over a span of two months from September to November 2022, this project represents a collaborative effort to provide sustainable energy solutions that align with URDA's humanitarian mission.
-
Client
Aarsal Hospital -
Category
Energy, Solar, Hospitals -
Date
September 2022 – November 2022 -
Project Capacity
39.24 kWp (Hybrid with Lithium Storage)
Customized Hybrid Design:
Tailored design solutions specific to URDA’s requirements, ensuring seamless integration of the 39.24kW Three-phase Hybrid Solar System with Lithium Storage.
Efficient Supply Chain Management:
Procurement and supply of high-quality solar components, including advanced panels and inverters, showcased our commitment to maximizing system performance in alignment with URDA’s humanitarian initiatives.
Lithium Storage Integration:
Implementation of cutting-edge lithium storage technology for efficient energy storage, meeting the unique needs of the collaboration with URDA.
Timely and Expert Installation:
As the Main Contractor, our team demonstrated efficiency and expertise during the installation phase, ensuring the successful incorporation of the Hybrid Solar System within the specified two-month timeframe.
The Role of MetaSol:
Serving as the Main Contractor in collaboration with URDA, MetaSol played a central role in overseeing the entire project lifecycle. From initial design conceptualization to final commissioning, our team showcased dedication and skill, delivering a sustainable and impactful energy solution that supports URDA’s humanitarian efforts.
How can our expertise be tailored to elevate your solar projects?
Explore Recent Projects
It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout.