Contact info

Address

Beirut, Lebanon

Phone

+961 81 022 074

Email

project@metasol.me
aarsal 1
Project Overview

As the Main Contractor, MetaSol spearheaded the design, supply, and installation of a 39.24kWp Three-phase Hybrid Solar System with Lithium Storage in collaboration with URDA (Union of Relief and Development Associations). Executed with precision over a span of two months from September to November 2022, this project represents a collaborative effort to provide sustainable energy solutions that align with URDA's humanitarian mission.

  • Client
    Aarsal Hospital
  • Category
    Energy, Solar, Hospitals
  • Date
    September 2022 – November 2022
  • Project Capacity
    39.24 kWp (Hybrid with Lithium Storage)

Customized Hybrid Design:

Tailored design solutions specific to URDA’s requirements, ensuring seamless integration of the 39.24kW Three-phase Hybrid Solar System with Lithium Storage.

Efficient Supply Chain Management:

Procurement and supply of high-quality solar components, including advanced panels and inverters, showcased our commitment to maximizing system performance in alignment with URDA’s humanitarian initiatives.

Lithium Storage Integration:

Implementation of cutting-edge lithium storage technology for efficient energy storage, meeting the unique needs of the collaboration with URDA.

Timely and Expert Installation:

As the Main Contractor, our team demonstrated efficiency and expertise during the installation phase, ensuring the successful incorporation of the Hybrid Solar System within the specified two-month timeframe.

DJI_0045
DJI_0058

The Role of MetaSol:

Serving as the Main Contractor in collaboration with URDA, MetaSol played a central role in overseeing the entire project lifecycle. From initial design conceptualization to final commissioning, our team showcased dedication and skill, delivering a sustainable and impactful energy solution that supports URDA’s humanitarian efforts.

How can our expertise be tailored to elevate your solar projects?